Empowering Industrial Excellence

As global supply chains evolve, our strategically positioned industrial park offers the precise infrastructure and unparalleled access you need for efficient, cost-effective operations at the US-Mexico border.

About Us

Pharr Industrial Park


A masterfully designed industrial community, strategically optimized for transportation, logistics, and manufacturing. Its prime location at the intersection of the 365 Toll Road and Las Milpas RD ensures seamless traffic flow, boosting operational synergy and accessibility. This strategic position, combined with its unparalleled proximity to the Pharr International Bridge—a top-ranked U.S. border crossing—establishes the park as a vital gateway for businesses and guarantees maximum efficiency for cross-border trade.

Click to activate

Built for Your Industry

Flexible Infrastructure for
your Industry’s Future

High-tech robots assembling a car in a modern factory setting, showcasing automation.
01

Manufacturing & Assembly

Develop state-of-the-art facilities perfect for production lines, robotics, and high-tech assembly operations.

Drone shot of a logistics center with trucks and parking lot in Poznań, Poland.
02

Logistics & Distribution Hubs

Build your ideal warehouse, cross-dock facility, or fulfillment center in a strategic location optimized for supply chain efficiency.

03

Specialized &
Cold Storage

From food-grade facilities to temperature-controlled environments, we provide the infrastructure for your operational needs.

Join Us in Transforming Industry

Unlock the potential for growth and innovation with PIP.

Unrivaled Strategic Location & Future-Proof Infrastructure

Pharr Industrial Park offers an unrivaled strategic location with future proof infrastructure. Key projects underway are designed to maximize efficiency and provide seamless access for all cross-border trade.

Pharr International Bridge:

DAP 15: 2 additional commercial entry lanes and 2 additional exit lanes
DAP 16: 25 additional dock spaces for dry dock and cold dock inspections
Twin Bridge: doubles capacity by adding 4 new lanes

365 Toll Road

A 12.2-mile, toll facility designed as a strategic corridor to expedite commercial traffic by directly connecting the Anzalduas and Pharr international bridges.

Hidalgo County Loop

A $4.2 billion strategic infrastructure initiative comprising 9 projects that will create 120+ miles of new roadways aimed at alleviating traffic congestion and fostering economic growth, with full completion anticipated by 2045.

Click to activate

Pharr International Bridge

#
Border Crossing in U.S. for Produce
rd
Largest Trade Hub on the Texas-Mexico border
No.
Border Crossing in the Nation
$B
Total Trade Value in 2024
$B
Imports in 2024
$B
Exports in 2024

Ready to Connect?

Partner with Us for Success

Reach out today to explore how PIP can elevate your business and drive growth.

Scroll to Top